Compute Supply and the Cost Line: Can Supply Keep Up, and When Does It Pay Off
This board answers four things: whether compute is enough (revenue per chip against the breakeven line), when supply comes online, who ends up with the compute, and where the cost line per chip is heading.
Read from the map: In progress and heading the right way; crosses the breakeven line in the second half of 2027
Revenue per H100e
$3,192
3Q26|five model companies' ARR ÷ market-wide compute
Cumulative compute
37.9M
3Q26|million H100e, coverage-adjusted
Purchase price per H100e
$12.1k
3Q26|quarterly chip spend ÷ new compute
Marginal ÷ average
2.3×
3Q26|above 1 = squeeze tightening
Next check
Breakeven line: $4.5k (second half of 2027) / $5.6k (around the end of 2028)
Revenue per H100e now $3,192 (3Q26)
How to read this board
Expand
Core view: Validate the yardstick on history first, then project. Annualized revenue per H100e jumped 77% from $1,320 to $2,335 between the fourth quarter of 2025 and the second quarter of 2026, exactly when public-cloud GPU prices and the B300 went up, proving that a surge in the yardstick means supply short of demand and real price increases. The latest quarter (3Q26) reached $3,192. Projected forward on the base case, the line crosses the $4.5k breakeven of a new site with depreciation in the second half of 2027 and the $5.6k key threshold around the end of 2028; beyond that, new compute earns a positive return at a 10% cost of capital, and additional capex turns from faith into arbitrage.
- Supply is bracketed by two estimates: the lower edge is the completion schedule of sites Epoch has seen break ground, the upper edge is chip-shipment trend extrapolation; from 2028 Epoch's coverage thins, so read toward the lower edge.
- The marginal yardstick turns before the average one: new ARR per new chip above the average means the squeeze continues; falling below it is the early warning that the yardstick is topping.
- The cost line is falling too: new-generation sites cost about 40% less than H100-era ones, so with revenue rising and cost falling, the crossing comes earlier than a static estimate. The dominant variable is depreciation life; three versus seven years moves every threshold by about 45%.
- Epoch's chip coverage thins in the latest quarters, so the rightmost bars understate rather than show falling demand; the dashed adjusted series assumes missing chips kept the prior quarter's pace, and the conclusion does not change.
Term: H100e is Epoch AI's unit for converting every vendor's chips into H100-equivalent compute, covering the whole market: Nvidia, Google TPU, AMD, Amazon Trainium, Huawei and others. Annualized revenue per H100e = the observable combined run rate of five model companies (OpenAI, Anthropic, xAI, Mistral, Zhipu) ÷ cumulative H100e market-wide, a yardstick for whether end AI revenue can carry new compute, not the rent cloud providers actually collect. The breakeven lines convert a 1GW data center's annualized total cost of ownership to each H100e: a new site with depreciation $4.5k, with cost of capital $5.6k (the key threshold), full annualized cost $6.5k.
Question 1Is there enough compute
1The tightness gauge: revenue per H100e, history and projection
The solid line is actual: from $1,320 in the fourth quarter of 2025 to $2,335 in the second quarter of 2026, coinciding with public-cloud GPU price increases and the B300 markup; a surging gauge means supply short of demand. Dashed lines are projections: scenario revenue divided by Epoch's data-center completion supply. The green shading is the zone above breakeven: its floor at $4.5k is the breakeven of a new site with depreciation, and the $6.5k line is the full annualized cost of ownership; the thick orange dashed line at $5.6k is the key threshold, beyond which new compute earns a positive return at a 10% cost of capital; the diamond marks when the base case crosses. The numerator is model companies' ARR, not the rent cloud providers collect.
Tightness Gauge: Annualized Revenue per H100e (History Plus Projection)#
Annualized revenue per H100e reached $3,192 in the latest quarter (3Q26), 2.4× the level three quarters earlier; on the base case it touches the $4.5k lower breakeven line in the second half of 2027.
How to read this chart
The orange zone is the price-increase test window. The green band, $4,500 to $6,500, is the target range: the lower edge is the breakeven line for a new site including depreciation, the upper edge a simplified annual total cost of ownership. The thick orange dashed line at $5,600 is the key threshold, above which incremental CapEx has positive NPV. The red dashed line at $9,500 is full breakeven on the installed base including cost of capital. The gold line at $1,400 is cash operating breakeven, already crossed. The five-company total is currently on a mixed basis: OpenAI's $50B at end-September excludes sales made through cloud partners, while Anthropic's $65B at end-July includes them, so the OpenAI piece runs low; Anthropic has no newer figure either. Both will be put on one basis once Anthropic's November IPO prospectus carries audited numbers.
Source: Epoch AI (CC BY 4.0); FinSight compilation and estimates · Updated 2026-11-03
2Back-solve: how much ARR it takes to reach breakeven at each date
section 1 run backwards: each row is a date, “compute at that date” is market-wide H100e under Epoch’s known-site schedule, and each threshold column is compute × threshold, the combined ARR of the five companies needed to touch that line; the “base-case ARR” column is the base case used for the dashed line in section 1. How to read it: by mid-2027 compute is about 60 million chips, so ARR needs $268B to reach $4.5k and $333B to reach the $5.6k key threshold, while the base case at $239B is still short; by the end of 2027 the base case of $372B against $375B just touches $4.5k; by the end of 2028, $711B against $726B is a hair below $5.6k. The table uses the lower edge of the supply band (known sites), so the more supply comes online, the more ARR it takes to touch a line.
Back-solve: the ARR needed at each date to reach each threshold (base case)#
The ARR needed to touch a line at each date = compute at that date × the threshold; on known-site supply, the base case just touches $4.5k at the end of 2027 and is a hair below $5.6k at the end of 2028.
| Date | Compute at that date (million H100e) | Base-case ARR | New build, with depreciation ($4.5k) | ★ New build, with cost of capital ($5.6k) | Marginal, with cost of capital ($6.5k) | Installed base, with depreciation ($7.5k) | Installed base, with WACC ($9.5k) |
|---|---|---|---|---|---|---|---|
| End of 2026 | 43M | $140B | $195B | $242B | $281B | $325B | $411B |
| Mid-2027 | 59M | $239B | $265B | $329B | $382B | $441B | $559B |
| End of 2027 | 81M | $372B | $363B | $451B | $524B | $605B | $766B |
| End of 2028 | 127M | $711B | $574B | $714B | $829B | $956B | $1211B |
Source: Epoch AI (CC BY 4.0); FinSight compilation and estimates · Updated 2026-11-03
3The marginal yardstick: new ARR carried by each new chip
The average yardstick = total ARR ÷ cumulative compute; the marginal yardstick = new ARR in the quarter ÷ new compute in the quarter, increment against increment with no stock inertia, so it turns before the average does. On history: in the fourth quarter of 2024 the marginal figure was only $52, as new compute went into training and monetization lagged; by the fourth quarter of 2025 it was back to $1,836 and above the average, so while the market read percentages as stagnation the marginal curve was already announcing 2026; in the second quarter of 2026 it was $4,488, 1.9× the average, and higher again in the third. Marginal above average means the squeeze continues; falling below average is the early warning of a top. The latest quarter includes a run-rate estimate and is drawn translucent.
ARR per Chip: Average vs Marginal ($/Chip/Year)#
The marginal yardstick sits above the average: each new chip carries more business than the installed average.
How to read this chart
Marginal = new ARR ÷ new compute. Average = ARR ÷ cumulative compute.
Source: Epoch AI (CC BY 4.0); FinSight compilation and estimates · Updated 2026-11-03
Marginal ÷ Average (x)#
One number to watch: marginal over average above 1 means the squeeze is deepening, below 1 is the early warning.
Source: Epoch AI (CC BY 4.0); FinSight compilation and estimates · Updated 2026-11-03
New ARR per Quarter ($B) = the Demand-Side Dollar Increment#
What data centers actually have to absorb is the dollar amount of new ARR each quarter, and it keeps getting bigger.
How to read this chart
Percentages feed the stock narrative; dollar amounts are what capacity planning has to work with. The translucent latest quarter includes a run-rate estimate. The five-company total is currently on a mixed basis: OpenAI's $50B at end-September excludes sales made through cloud partners, while Anthropic's $65B at end-July includes them, so the OpenAI piece runs low; Anthropic has no newer figure either. Both will be put on one basis once Anthropic's November IPO prospectus carries audited numbers.
Source: Epoch AI (CC BY 4.0); FinSight compilation and estimates · Updated 2026-11-03
New H100e per Quarter (Millions) = the Supply-Side Increment#
New compute per quarter is expanding too; the latest quarter includes a run-rate estimate.
How to read this chart
Market-wide new compute, taken as the quarterly change in the coverage-adjusted cumulative series: missing chips are filled in and the unfinished quarter is projected at its current pace, so the latest quarter is an estimate rather than a partial undercount; it is drawn translucent and will be revised next quarter.
Source: Epoch AI (CC BY 4.0); FinSight compilation and estimates · Updated 2026-11-03
4Price times quantity against revenue: the monetization rate
A second check on section 1 in dollars: part of the rise in revenue per chip comes from chips getting dearer, so only if the dollar-based ratio is still rising has demand really caught up. Left: market-wide cumulative chip spend against the combined run rate of five model companies. Right: the monetization rate = annualized revenue ÷ cumulative chip spend, how much annualized revenue each dollar of chip capital supports. Reading: with the price per unit of compute no longer falling, a monetization rate still sliding would be evidence of oversupply, revenue failing to keep up after price increases; a rising rate means demand is keeping up. Today the price has stopped falling and the monetization rate is still rising.
Cumulative Chip Spend vs AI Companies' Annualized Revenue#
Market-wide cumulative chip spend against the five model companies' annualized revenue: spending still dwarfs revenue.
Source: Epoch AI (CC BY 4.0); FinSight compilation and estimates · Updated 2026-11-03
Monetization Rate: Annualized Revenue ÷ Cumulative Chip Spend (%)#
Annualized revenue per dollar of chip capital has been rising through the price-increase period, not what oversupply looks like.
How to read this chart
Annualized revenue per dollar of chip capital. If this line falls during a price-increase period, that is evidence of oversupply.
Source: Epoch AI (CC BY 4.0); FinSight compilation and estimates · Updated 2026-11-03
Question 2Where supply comes from
5Supply timetable: how many GW come online each half year, and whose
This is the key chart for the whole supply side. IT power coming online each half year, stacked by owner; past dates are verified from satellite imagery, future dates are Epoch’s estimated completions. Every half year from 2026 to 2028 brings 3 to 7 GW online, and in the second half of 2028 Oracle alone is most of it. The drop after 2029 is because Epoch only records sites that have broken ground, with two to three years of visibility, not a real supply cliff.
When Supply Arrives: New IT Power per Half Year (GW, Stacked by Owner)#
Half-year supply additions are thickest from 2026 to 2028; the drop after 2029 reflects only sites already under construction being counted, not a real cliff.
How to read this chart
Dates are when each block of capacity comes online: past dates are verified by satellite imagery, future dates are estimated completion. Only sites under construction are included, with visibility of about two to three years, so the drop after 2029 is not a real supply cliff.
Source: Epoch AI (CC BY 4.0); FinSight compilation and estimates · Updated 2026-11-03
6All sites combined, and the build trajectories of the largest
Left: the sum of 71 tracked sites, where a steeper slope means faster build-out; the dashed line is cumulative capital cost. Right: the ten largest sites by peak power, each line one site’s IT-power build-out, with future dates as planned values. Use the left chart for the pace of supply growth and the right one for individual projects.
All Sites Combined: IT Power and Capital Cost#
Across 71 tracked sites, both IT power and capital cost climb in steps.
Source: Epoch AI (CC BY 4.0); FinSight compilation and estimates · Updated 2026-11-03
Large Data Centers: IT Power Built Out (MW)#
The ten largest sites keep adding IT power on schedules that run to 2028; future points are plans.
How to read this chart
The ten largest sites by peak power; future dates are plans.
Source: Epoch AI (CC BY 4.0); FinSight compilation and estimates · Updated 2026-11-03
7Chip shipments: new compute and chip spend each quarter
Left: new H100e compute each quarter stacked by chip model, with the B300 now the largest block. Right: Epoch’s cost estimates summed, which is the implied chip purchase spend. Coverage follows Epoch’s own description: only Nvidia, Google TPUs, Amazon Trainium, AMD Instinct and Huawei Ascend, which Epoch considers the large majority of global AI compute; custom chips from Microsoft, Meta and Tesla and consumer GPUs are not included. Nvidia data starts in 2022, the other four only in 2024; Nvidia estimates are the most confident, Amazon the least. Some quarters are incomplete and drawn translucent, so the rightmost quarters are understated rather than falling demand.
New H100e Compute per Quarter (Stacked by Chip Model)#
New compute added each quarter keeps growing, with the B300 now the largest block and the TPU v7 ramping next; translucent quarters are not yet fully covered.
How to read this chart
Median estimates; translucent quarters have incomplete coverage.
Source: Epoch AI (CC BY 4.0); FinSight compilation and estimates · Updated 2026-11-03
Estimated Chip Spend per Quarter ($B, by Maker)#
Implied chip spend rises quarter after quarter, with Nvidia still the bulk of it.
Source: Epoch AI (CC BY 4.0); FinSight compilation and estimates · Updated 2026-11-03
Question 3Who gets the compute
8Who is locking in compute, who owns it
Left: by user attribution of Epoch's data centers, the trajectory of capacity online plus planned completions, where the slope is how hard each player is grabbing compute; "unlabeled" is mostly sites with undisclosed customers, and coverage thins after 2028. Right: cumulative H100e stock by owner through the first quarter of 2026, in-house chips included (Google TPU and Amazon Trainium under their own names), showing how capex turns into compute assets and who is gaining: Oracle and xAI surging, China held back by export controls.
Compute by User: Who's Locking It Up (Millions of H100e, Including Scheduled Completions)#
By site allocation, OpenAI has the most compute locked up through 2028 with Google close behind; the slope shows how hard each is grabbing capacity.
How to read this chart
Allocated by each data center's user field, split evenly where there are several users; unlabeled is mostly sites whose customers are undisclosed. The path combines capacity already online and scheduled completions; coverage thins after 2028.
Source: Epoch AI (CC BY 4.0); FinSight compilation and estimates · Updated 2026-11-03
Compute by Owner: Cumulative H100e Stock (Millions)#
Cumulative compute stock by owner: Google, counting TPUs, is largest, followed by Microsoft and Amazon.
How to read this chart
Stacked area, 1Q22 to 1Q26; in-house chips (Google TPU, Amazon Trainium) are counted under their owners.
Source: Epoch AI (CC BY 4.0); FinSight compilation and estimates · Updated 2026-11-03
10Model-company economics: compute cost as a share of revenue, and token volume
Left: compute cost as a share of revenue; above 100% means compute alone exceeds all revenue, and dropping below 100% is the turning point of the business model. Anthropic is around twenty percent, OpenAI still above seventy in 2025. Right: daily tokens processed, on a log axis by default: a straight line means a constant growth multiple, and the Google line flattening means the yearly multiple fell from 50× to 7× while volume itself keeps compounding, which the linear view shows; the gap between the explosion in volume and revenue growth is the revenue deflation per token. Google discloses all-products volume once a year (3.2 quadrillion a month in May 2026, about 107 trillion a day) and first-party API volume every earnings call (22 billion a minute in the second quarter of 2026, about 32 trillion a day); OpenAI’s API ran at 15 billion a minute in April 2026. Scopes are drawn separately and absolute levels are not comparable across lines; new US company disclosures will be added as they come.
Compute Cost as a Share of Revenue (%)#
Compute cost falling below 100% of revenue is the business-model turning point: Anthropic is down to 21.0% in 2026 and OpenAI reached 76.0% in 2025.
How to read this chart
Bars are the year’s compute spend divided by annualized revenue. The red dashed line is 100%, where compute spend exactly equals total revenue; above it, compute alone costs more than all the revenue, and only below it is there room to pay other costs. The line covers compute only, not the company’s overall profit and loss.
Source: Epoch AI (CC BY 4.0); FinSight compilation and estimates · Updated 2026-11-03
Tokens Processed per Day (Trillions)#
Daily tokens processed still rise in a straight line on a log axis; volume is exploding far faster than revenue, so revenue per token is deflating.
How to read this chart
Scopes are drawn separately: “all AI products” is everything Google runs, “API” only counts direct developer calls, so absolute levels are not comparable across lines. Epoch’s series ends in October 2025; later Google and OpenAI figures are added by FinSight from earnings calls and launch events, with per-minute numbers multiplied by 1,440 and monthly numbers divided by 30.
Source: Epoch AI (CC BY 4.0) and company announcements; FinSight compilation · Updated 2026-11-03
Question 4The cost line is moving
11Purchase price per unit of compute: the fall has stopped
Left: the blended purchase price = market-wide chip spend in the quarter ÷ new H100e in the quarter, down from $38k in 2022 to $13.5k in the third quarter of 2025, then the decline stopped and the price rose to $14.1k in the first quarter of 2026, consistent with B300 volume and HBM price increases; the dashed line is the coverage-adjusted series. Right: price per unit of compute by chip generation; B200 to B300 is the first time in the data that a new generation costs more per unit of compute; H20 and Ascend look expensive because their compute is constrained, not because they are premium.
Blended Purchase Price: Cost per H100e (US$ Thousands)#
The blended purchase price per H100e turned up in 2026 as newer chip generations cost more.
How to read this chart
Quarterly chip spend divided by quarterly new compute; translucent points are quarters with incomplete coverage.
Source: Epoch AI (CC BY 4.0); FinSight compilation and estimates · Updated 2026-11-03
Chip Generations: Price per H100e vs Launch Date (log)#
B200 to B300 was the first time a new generation got pricier; H20 and Ascend look expensive because their compute is constrained, not because of high prices.
Source: Epoch AI (CC BY 4.0); FinSight compilation and estimates · Updated 2026-11-03
Question 5Method
12How the projection is built: supply and demand compute in the same unit
This is the worksheet behind the dashed projection in section 1: numerator and denominator drawn as separate lines in the same unit. Demand compute = scenario revenue ÷ efficiency-adjusted revenue per H100e, anchored at the second quarter of 2026; supply is the completion schedule of Epoch’s sites that have broken ground, and the dashed band shows two supply estimates, known sites at the bottom and a chip-shipment trend extrapolation covering future sites at the top. The gap between the lines is how tight the market is, and demand hugging or crossing supply means a squeeze; use this chart to see why the projection crosses the line and how sensitive the timing is to the supply assumption.
Compute Supply vs Compute Demand (Same Units, Millions of H100e)#
Demand hugging or crossing the supply line means a squeeze; the dashed band is the two supply estimates, known sites at the bottom and trend extrapolation at the top.
How to read this chart
Demand compute = revenue ÷ efficiency-adjusted revenue per chip, anchored to 2Q26. The blue dashed band shows two supply estimates: the lower edge from known sites, the upper edge from extrapolating chip shipments.
Source: Epoch AI (CC BY 4.0); FinSight compilation and estimates · Updated 2026-11-03
13Method: how the breakeven lines are derived
Based on Epoch AI's total-cost-of-ownership model for a 1GW data center: $38B of upfront capex, $0.9B a year of operating cost, $8.5B a year of annualized total cost, with servers at 60%; five-year IT equipment life, fourteen-year buildings, 71% utilization, a 10% discount rate. Converted per H100e: 1GW is about 1.24 million chips, existing sites cost $30.6k per chip, new-generation sites only $13k to $19k. The table lists the formula, key assumptions and range for every threshold line.
Model Basis: How the Threshold Line and Projections Are Derived (For Reference)#
How each of the six cost lines is built: the formula, the key assumption and the range.
| Threshold | How it is built | Key assumption | Range |
|---|---|---|---|
| Cash operating breakeven $1.4k | $0.9B per GW ÷ 1.24M chips | Power and maintenance only, no capital recovery | $0.7k; our conservative estimate $1.4k: already passed |
| New build with depreciation $4.5k | New-generation capex of $13k to $19k per chip ÷ 5 years + opex | Five-year straight-line depreciation; new-generation chip mix | $4.0k to $5.2k, midpoint $4.5k |
| New build with cost of capital $5.6k ★ key | ($13k to $19k) × CRF 26.4% + opex | CRF = five-year annuity at a 10% WACC; crossing it means new compute turns NPV-positive at a 10% cost of capital and added capex goes from faith to arbitrage: the key dividing line of this model | $4.8k to $6.4k, midpoint $5.6k |
| Marginal with cost of capital $6.5k | Direct conversion of Epoch’s annualized 1GW total cost of ownership ($8.5B a year ÷ 1.24M chips, simplified) | Converges with the independent CRF derivation | $6.2k to $6.9k; $6.5k taken as the top of the target range |
| Installed base with depreciation $7.5k | Installed-base capex midpoint $30.6k ÷ 5 years + opex | Installed base includes the dearer H100 generation | $7.5k (three-year depreciation → $11.6k) |
| Installed base with WACC $9.5k | $30.6k × CRF 26.4% + opex | Full economic breakeven (entire installed base recovered) | ~$9.5k |
Source: Epoch AI (CC BY 4.0); FinSight compilation and estimates · Updated 2026-11-03